Our Mission: "To consistently delight our customers by exceeding their expectations in every area of service"

 

 


Lots and lots of pictures downloading! Please be patient.

Our latest construction project is detailed in the photos below. At Hurley Chrysler Jeep, we pride ourselves in continually improving our dealership to better serve our precious customers. This phase of construction consists of 3 elements:

  • Drive through and advisor area expansion

  • Customer Lounge

  • New Service Bays.

Drive through from front Rear view showing new office Advisor's new office, inside

DriveThru Front.jpg (5042 bytes)

DriveThru Rear.jpg (5245 bytes)

New Advisors office.jpg (6598 bytes)

A little paint goes a long way! Area added, customer lounge New area during construction

Adv office painted.jpg (4228 bytes)

Scott's old office.jpg (6277 bytes)

Lounge new corner.jpg (5257 bytes)
New area after construction Rear View before addition Get ready for the demolition!
New Lounge corner.jpg (7027 bytes) shopback.jpg (5980 bytes) oldshop.gif (74911 bytes)
View from drive through Side view before addition Let's dig a hole and make a mess
ServiceBaysSouth.jpg (7480 bytes) ServiceBaysSouthRear.jpg (6375 bytes) Earth Moving.jpg (7608 bytes)
Tear up the slab... and move some dirt around Is this a Chrysler or a Jeep?
Busted slab.jpg (7516 bytes) Torn up slab.jpg (7979 bytes) tractor.jpg (8323 bytes)
The footer Ready Let's pour....
footer.jpg (9116 bytes) Rinker truck close.jpg (8443 bytes) Slab pour.jpg (6769 bytes)
Some concrete And some more concrete All done and ready for steel
Rinker truck.jpg (6951 bytes) slabpour.jpg (6482 bytes) Finished slab.jpg (6321 bytes)
Steel Steel And more steel
steel1.jpg (8757 bytes) steel2.jpg (9257 bytes) steel3.jpg (7468 bytes)
The first steel beam Standing tall Bolted down snug and secure
First Beam.jpg (10564 bytes) Standing beam.jpg (7559 bytes) beam bolts.jpg (6102 bytes)
Four corners Pointing up Roof beams with cables
4 steel corners.jpg (8208 bytes) beams pointing.jpg (8761 bytes) Beams and cables.jpg (6758 bytes)
Putting it all in place...... takes a tall crane Could this be a building?
crane1.jpg (6006 bytes) crane2.jpg (10247 bytes) Steel bldng.jpg (8601 bytes)
Getting there one beam at a time Lots of siding to this story!
almost.jpg (9788 bytes) roofline.jpg (10655 bytes) Siding start.jpg (9171 bytes)
Getting the roof beams on And the roof too Siding almost done
Roof beams.jpg (9260 bytes) Steel Roof.jpg (9315 bytes) Steel Side.jpg (7859 bytes)
One door goes up Then some more And the rest of the doors
newdoor.jpg (6933 bytes) InsideDoors.jpg (7588 bytes) OutsideDoors.jpg (6329 bytes)
New meets old to make one big Shop under one roof
New and old1.jpg (5994 bytes) new and old2.jpg (5633 bytes)

new and old3.jpg (8096 bytes)

The first two lifts being set up 6 in place now A plug for Hayden Hoists!
First Lift.jpg (8246 bytes) 6lifts.jpg (8251 bytes) hayden.jpg (6954 bytes)
The Trees are coming Before Trees After Trees
tree moving 2.jpg (11022 bytes) Copy of Before trees 3.jpg (13104 bytes) After trees.jpg (15232 bytes)
Shot Blasted floor Pouring on the epoxy base Spreading the gooey stuff
ShotBlastFloor.jpg (4022 bytes) epoxy.jpg (3557 bytes) BrushEpoxy.jpg (4764 bytes)
Silica sand to provide floor grip Silica sand on epoxy base Plug for Specialty Flooring
SilicaSand.jpg (4231 bytes) SilicaFloor.jpg (3353 bytes) danplug.jpg (5545 bytes)
Epothane with color added Being brushed on and being rolled on too.
epothane.jpg (8748 bytes) EpoxyPainters.jpg (7444 bytes) PaintItOn.jpg (4606 bytes)
Finished new shop floor Old shop floor before epoxy Shot blasting old shop floor
NewFloor2.jpg (6352 bytes) OldFloorBefore.jpg (5888 bytes)

Blast away the years Like new again A tired worker called Elliott
Before new offices Before new offices Side view
Before the last slab pour New shop filled with cars Even the old shop looks good!

New equipment arrives daily "Hunter" alignment system Jim Baldauff General Contractor
New Equipment.jpg (8736 bytes) New Hunter.jpg (7602 bytes) Jim B on tractor.jpg (8769 bytes)

That's it as of 09/04/02. We will add images to this as we progress. Thanks for your visit. You were # Hit Counter since we created this gallery.


| HOME Email | Meet The Staff | New Cars | Used Cars | Service | Parts |
| Contact Info/Map Hurley's Heroes | News/Hurley Herald | Request Info
| Birds Eye View | Car Buyer Resources | Credit Application | Current Incentives

Site Support E Mail: mis@hurleycars.com
© 1997-2005 Hurley Chrysler Jeep Inc.
Call Us in Deland at 386-736-3000
or Toll Free 1-800-733-4875